The Building Safety Act 2022 is the law that overhauls how residential buildings in England are designed, built, registered, and maintained after Grenfell. It creates a new regulator, forces higher-risk buildings through three mandatory approval stages, makes a named person legally responsible for safety once people move in, extends the time residents have to bring claims for defective work, and shields most leaseholders from the bill for fixing historical safety defects.
Not every rule in the Act applies to every building. Many of the toughest duties are reserved for “higher-risk buildings,” meaning buildings at least 18 metres tall or with at least seven storeys that also contain at least two residential units.1GOV.UK. Criteria for Determining Whether a Building Is a Higher-Risk Building During the Occupation Phase of the New Higher-Risk Regime A tall office block with no flats does not qualify. Hotels, military barracks, and secure residential institutions are also excluded.2GOV.UK. Definition of Higher-Risk Buildings – Initial Review and Plans for Ongoing Review If your building meets the definition, it has to be registered, it will have a named accountable person, and its design and safety records must be kept for as long as it stands.
The Building Safety Regulator
Part 2 of the Act creates the Building Safety Regulator, housed inside the Health and Safety Executive. It oversees the safety of all buildings in England, regulates higher-risk buildings directly, and drives competence across the construction professions. It also keeps the registers of building inspectors and building control approvers that decide who can lawfully sign work off.
For higher-risk buildings, the Regulator is the sole building control authority. That work no longer sits with private-sector approved inspectors competing for developer business.
What the Regulator Can Do
The Regulator can issue compliance notices demanding specific fixes, and stop notices ordering all work on a site to halt at once. Ignoring either notice is a criminal offence carrying up to two years in prison on indictment, plus a daily fine for each day the breach continues.3Legislation.gov.uk. Building Safety Act 2022 – Section 38 Separate Part 4 offences cover the occupation phase. Failing to register a higher-risk building, failing to apply for a building assessment certificate, giving false information to the Regulator, or obstructing its work can all attract unlimited fines, and the most serious carry prison sentences.
Competence of the People Doing the Work
Every building project must now have a named principal designer and principal contractor who are competent for what they are doing. Before appointing anyone to a higher-risk project, the person making the appointment has to check whether the proposed appointee has any serious infractions in the previous five years, meaning past non-compliance with building regulations, fire safety law, or health and safety legislation. Building control approval applications for higher-risk projects must include a competence declaration confirming the relevant British Standards are met.4GOV.UK. Design and Building Work – Meeting Building Requirements
The Three Gateways for Higher-Risk Buildings
Higher-risk buildings have to clear three checkpoints. Each is a hard regulatory stop. If the developer cannot satisfy the Regulator at any stage, the project does not move forward.
Gateway 1: Planning
At the planning application stage, developers submit a fire statement covering site layout, emergency vehicle access, water supplies for firefighting, and any consultation with the fire service.5GOV.UK. Fire Safety and High-Rise Residential Buildings (From 1 August 2021) The Health and Safety Executive is a statutory consultee, so the planning authority has to seek and consider its views before granting permission.
Gateway 2: Before Construction Begins
Before any work starts on site, the developer files a full building control approval application with detailed plans, a fire and emergency file, and a construction control plan. Work cannot begin until the Regulator approves it.6GOV.UK. Building Control Regime for Higher-Risk Buildings (Gateways 2 and 3) – Factsheet
Gateway 3: Completion
Once construction finishes, the developer applies for a completion certificate. The Regulator checks that the building was built to the approved plans and that safety systems are working. Until the certificate is issued, the building cannot be legally occupied.6GOV.UK. Building Control Regime for Higher-Risk Buildings (Gateways 2 and 3) – Factsheet
Changes Between Gateways
Any change to approved plans between Gateway 2 and Gateway 3 must be classified. Notifiable changes, such as altering an opening in a fire-rated wall or changing a fire safety document, have to be reported to the Regulator before related work starts, though work can proceed once notification is submitted. Major changes, like altering the structural system or converting commercial space to residential, void the original Gateway 2 approval. All related work must stop, a fresh application goes in, and the Regulator has up to six weeks to assess it before work can restart.7GOV.UK. Making Changes to a Higher-Risk Building Project
The Golden Thread of Information
The “golden thread” is a digital record-keeping duty that runs for the life of a higher-risk building. It captures architectural drawings, fire safety strategies, material specifications, structural calculations, and records of any changes made during or after construction.
Before the Act, buildings routinely changed hands with incomplete or missing safety records. Details about fire compartmentation or cladding would disappear when a special-purpose developer company was wound up or when a managing agent lost files. The golden thread stops that by requiring the information to be stored digitally, kept accurate, and handed to each new responsible party when ownership changes. The Regulator, emergency services, and residents all have rights to access relevant parts of it. Failing to maintain it can delay or block a building assessment certificate and, in serious cases, trigger enforcement action.
Who Is Accountable Once People Move In
Part 4 of the Act creates two statutory roles for occupied higher-risk buildings. An Accountable Person is whoever holds a legal estate in the building or has an obligation to repair the common parts. In practice, that is usually the freeholder, a management company, or a residents’ management corporation.8GOV.UK. Safety in High-Rise Residential Buildings – Accountable Persons9GOV.UK. Preparing a Building Assessment Certificate Application10Making Buildings Safer. Role of Accountable Persons for High-Rise Residential Buildings
The Safety Case Report
Every Accountable Person has an ongoing duty to assess and manage building safety risks, which the Act defines as risks from the spread of fire or smoke and risks of structural failure.11GOV.UK. Preparing a Safety Case Report The assessment feeds into a safety case report submitted to the Regulator, setting out the risks in the building, the steps taken to reduce and control them, and evidence that those steps work. The report has to be kept up to date as the building changes.
Residents’ Engagement Strategy
The Principal Accountable Person must also produce a written residents’ engagement strategy describing what safety information residents will get, what they will be consulted on, and how their views will be collected and used. Where planned works will last more than a day and block access or disrupt residents’ lives, the Principal Accountable Person has to ask residents specifically about timing and how to minimise disruption. Each consultation on the strategy must last at least three weeks. Residents who are unhappy with the strategy can complain to the Principal Accountable Person, and escalate to the Regulator if that does not resolve things.12GOV.UK. Preparing a Resident Engagement Strategy
What Leaseholders Pay for Remediation
Schedule 8 of the Act deals with who pays to fix historical safety defects such as flammable cladding and missing fire stopping. The Act’s answer is that qualifying leaseholders pay nothing or as little as possible, and cost falls first on whoever built or owns the building.
Who Qualifies
A qualifying leaseholder is someone whose flat was their only or main home on 14 February 2022, or who owned no more than three dwellings in the UK in total on that date.13GOV.UK. Leaseholder Protections on Building Safety Costs in England – Frequently Asked Questions To prove eligibility, a leaseholder must complete a leaseholder deed of certificate if the landlord requests one, for example during a sale or when a defect is identified. The certificate is a hard-copy document supported by an official title register from HM Land Registry. Failing to provide it when requested means losing the cost protections.14GOV.UK. Leaseholder Protections – Deed of Certificate – Frequently Asked Questions
The Cost Waterfall
Liability follows a set order. The original developer pays first. If the developer cannot be found or lacks the means, the building owner or freeholder pays, but only if the landlord group’s net worth is above £2 million per relevant building.15GOV.UK. Remediation Costs – What Leaseholders Do and Do Not Have to Pay Only as a last resort do any costs reach qualifying leaseholders, and even then, strict caps apply.
For non-cladding defects, the caps spread over ten years and vary by property value and location:16GOV.UK. Leaseholder Contribution Caps
- Properties valued under £175,000, anywhere in England: £0.
- Properties valued £175,000–£324,999 outside London: £10,000 over ten years.
- Properties valued £175,000–£324,999 in Greater London: £0.
- Properties valued £325,000–£1 million outside London: £10,000 over ten years.
- Properties valued £325,000–£1 million in Greater London: £15,000 over ten years.
- Properties valued over £1 million: £50,000–£100,000 depending on exact value.
The maximum charged in any single year is one-tenth of the total cap, so landlords cannot front-load the bill.16GOV.UK. Leaseholder Contribution Caps For cladding remediation, qualifying leaseholders pay nothing at all, whatever the property is worth.
Landlord Certificates
When a landlord becomes aware of a relevant defect, plans to pursue a leaseholder for remediation costs, or receives notice that a leaseholder plans to sell, the landlord must provide a landlord’s certificate. It discloses the landlord’s financial position, whether they meet the £2 million contribution condition, and their liability for remediation costs, so leaseholders can see who is actually on the hook before they agree to pay or complete a sale.
Court Orders Against Landlords and Developers
Courts can issue remediation orders under Section 123, requiring a landlord to fix specific safety defects within a set timeframe. Where the entity that built the building is separate from the current owner, courts can issue remediation contribution orders under Section 124, compelling developers or their parent companies to pay. These orders stop costs stalling in disputes while residents live with unresolved safety risks.
Longer Windows to Bring a Claim
Before the Act, claims for defective building work often failed on time limits. The standard limitation period was six years, and by the time cladding problems or fire-stopping failures came to light, the window had closed.
Defective Premises Act Claims
Section 135 extends the time limits for claims under the Defective Premises Act 1972. For any right of action arising on or after 28 June 2022, the limitation period is 15 years from the date the right of action accrued. For claims that arose before that date, the limitation period is 30 years, specifically to reopen claims against developers whose defective work on existing buildings would otherwise have been time-barred.17Legislation.gov.uk. Building Safety Act 2022 – Section 135
Civil Claims for Breaching Building Regulations
The Act also brought into force Section 38 of the Building Act 1984, which had sat on the statute book since 1984 without being commenced. Section 38 makes a breach of building regulations actionable as a civil claim where the breach causes damage.3Legislation.gov.uk. Building Safety Act 2022 – Section 38 Before commencement, a breach could lead to local authority enforcement but not to compensation for the people harmed. That gap is now closed.
Building Liability Orders
Section 130 allows the High Court to make building liability orders where it considers it just and equitable to do so. These orders reach through to an associated company, making it liable for the building safety obligations of the original body corporate. The provision targets the practice of creating a special-purpose vehicle for each project and dissolving it after sale, leaving no entity to sue when defects appear years later.
The New Homes Ombudsman Scheme
Part 5 requires the Secretary of State to establish a new homes ombudsman scheme, giving buyers of new-build homes a formal route for complaints about defects and poor workmanship. Membership is open to all developers, and the Secretary of State can make membership compulsory by regulation, including requiring developers to remain members for a specified period after they stop building.18Legislation.gov.uk. Building Safety Act 2022 – New Homes Ombudsman Scheme
Qualifying complainants can have their complaints investigated and determined by an independent individual. Where developers breach the scheme’s requirements, the Act provides for civil sanctions, with rights of appeal to a court or tribunal.18Legislation.gov.uk. Building Safety Act 2022 – New Homes Ombudsman Scheme Because membership can be made mandatory, expulsion for persistent non-compliance would effectively bar a developer from operating.