When a contractor hits a power line while digging on your property, responsibility almost always traces back to whoever failed their duty of care before or during the excavation. In most cases that is the contractor, especially if they dug without calling 811 or ignored the utility markings. But a utility company that placed inaccurate marks, or a homeowner who withheld information about private lines or hired unqualified help, can end up sharing the bill. Nearly 197,000 underground utility damages were reported in the United States in 2024, and close to half happened because someone dug without getting a locate first.1Common Ground Alliance. Spotlight on 2024 Data – DIRT Report
The Contractor Is the Default Answer
A contractor who digs without calling 811 has almost no defense. Federal law requires every state to run a one-call notification program so excavators can find out where buried utilities are before they dig,2Office of the Law Revision Counsel. 49 USC 6103 – Minimum Standards for State One-Call Notification Programs and skipping that step is treated as clear negligence in virtually every jurisdiction. The U.S. Department of Transportation reports that calling 811 before digging gives a 99 percent chance of avoiding a utility strike.3US Department of Transportation. Call 811 Before You Dig A contractor who didn’t make that call is on the hook for the repair, the emergency response, restoring power to affected customers, and damage to surrounding property.
Even a contractor who did call 811 can still be found at fault. Markings show an approximate location, not the exact position of the cable, and every state defines a tolerance zone around each mark, usually 18 to 24 inches on each side. Inside that zone the contractor is required to hand-dig or use soft excavation methods like vacuum excavation. Running a backhoe up to the mark, digging outside the area described in the locate request, or ignoring visible paint or flags shifts fault squarely back to the contractor. OSHA’s excavation standards require the employer to determine the estimated location of underground installations before opening the excavation, contact utility owners within local response times, and then use safe means to pinpoint the exact location as digging approaches.4eCFR. 29 CFR Part 1926 Subpart P – Excavations Investigators will walk through what the contractor actually did step by step and compare it to those requirements.
When the Utility Company Is Responsible
Utility companies are not passive participants. Once they receive a locate request, they have a legal obligation to mark their infrastructure accurately and on time. If the utility fails to respond, places marks in the wrong location, or marks only some of its lines in the excavation area, the company can be held partially or entirely liable for the damage.
This is a real and recurring problem. Contractors frequently report inaccurate markings and slow response times from utilities. When an excavator follows the marks in good faith and still hits a line, fault shifts to the company that put the marks in the wrong place. In that scenario the utility typically bears the repair costs and may owe the contractor and homeowner for delays and property damage.
There is a caveat. If a utility cannot determine the exact location of its lines and the contractor decides to proceed anyway, OSHA requires the contractor to move forward with caution and use detection equipment to locate the installations independently.4eCFR. 29 CFR Part 1926 Subpart P – Excavations A contractor who plows ahead without that extra caution still owns some of the risk.
When You, the Homeowner, Can Be on the Hook
Homeowners get pulled into liability in a few predictable ways. The one that catches people off guard is private utility lines. The 811 system only covers lines owned by member utilities. Wiring to a detached garage, a well pump, a pool, or landscape lighting will not be marked. Those are your responsibility. If you knew a private electric line ran to a shed and didn’t mention it, you may be at fault when the contractor’s shovel finds it. The same applies to giving wrong information about property boundaries or the location of known underground features.
Hiring decisions matter too. If you knowingly hire someone who is unlicensed, uninsured, or plainly unqualified for excavation work, a court can find you negligent in your selection. The exposure grows if you were directing the work yourself rather than leaving decisions to a professional. At that point you start to look less like a homeowner who hired a contractor and more like an employer supervising an employee, which changes the liability picture entirely.
If you have private lines and are not sure where they run, hiring a private locating company before the project starts, usually a few hundred dollars, is far cheaper than paying for a line repair afterward.
How Shared Fault Gets Divided
Many strikes involve more than one party making mistakes. A contractor may have used the wrong equipment near a mark while the utility’s paint was also 12 inches off from the actual line. The law does not force an all-or-nothing choice. Most states use comparative negligence, which divides fault by percentage based on each party’s contribution to the damage.
If a court determines the contractor was 60 percent at fault for using a backhoe in the tolerance zone and the utility 40 percent at fault for inaccurate markings, each pays its share. A handful of states still follow contributory negligence, where any fault on the injured party’s part can bar recovery entirely, but comparative negligence is the dominant approach nationwide. Where the homeowner also contributed, for instance by failing to disclose a known private line, all three parties can be assigned a share. These disputes often get resolved between insurance carriers, but they can end up in court when the amounts are large or the facts are contested.
Where the Money Actually Comes From
The contractor’s general liability insurance is the usual source of funds when a line gets hit. That coverage is designed to pay for property damage caused by the contractor’s operations. Before work begins, ask for a Certificate of Insurance and confirm the policy is current, lists the contractor’s actual business name, and carries enough coverage to handle a utility strike. If the policy expires before your project ends, resolve it before anyone picks up a shovel.
Your written contract is the other piece. Any agreement with an excavation contractor should include an indemnification clause that spells out who pays when something goes wrong. Indemnification means the contractor agrees to compensate you for losses caused by their work, including third-party claims like a utility company’s repair bill. Good indemnification language requires the contractor to both indemnify and defend you, so they cover legal costs if you get sued, not just damages. The standard exception is that the contractor does not have to cover losses caused by your own negligence or willful misconduct.
Your homeowner’s insurance may provide backup coverage if the contractor’s policy falls short or if you are found partially at fault, but do not rely on it as a primary safety net. Homeowner’s policies vary widely in how they treat damage arising from construction work on the property. The reliable move is to confirm the contractor’s coverage upfront and put the financial risk where it belongs in the contract.
Fines and Penalties on Top of the Repair Bill
Beyond paying for the damage itself, the party at fault can face separate regulatory penalties. OSHA can cite a contractor for failing to locate underground installations before excavation. As of January 2025, a willful violation of OSHA safety standards carries a maximum fine of $165,514 per violation, and even a serious but non-willful violation can result in a fine of over $16,000.5OSHA. OSHA Penalties
State one-call programs add another layer. Federal law requires each state to impose administrative or civil penalties that match the seriousness of the violation, with increased penalties for repeat offenders.2Office of the Law Revision Counsel. 49 USC 6103 – Minimum Standards for State One-Call Notification Programs Dollar amounts vary by state, with some imposing fines of several thousand dollars per violation. First-time offenders in some states may be offered training in lieu of a fine; repeat violators face escalating penalties.
If the damage involves a pipeline rather than an electric line, federal pipeline safety law authorizes civil penalties of up to $100,000 per violation per day, capped at $1,000,000 for a related series of violations.6Watershed Council. 49 USC 60122 – Civil Penalties Those larger figures mostly apply to commercial work near gas or oil pipelines, but they show how seriously the federal government treats failure to use locate systems. Even on a residential project, the combination of repair costs, fines, and lawsuit exposure makes skipping an 811 call one of the most expensive shortcuts a contractor can take.
Right After the Strike
Before anyone starts sorting out liability, get the site safe. A damaged buried cable can energize the surrounding soil, nearby metal objects, and even standing water, and you do not need to see sparks for the area to be dangerous. OSHA advises treating every electrical line as energized until it has been tested and confirmed otherwise. Anyone in contact with the equipment that struck the line should stay put unless there is a fire. If they must exit, they should jump clear so they are never touching the equipment and the ground at the same time, then shuffle away in small steps with both feet together.7OSHA. Working Safely Around Downed Electrical Wires
Once everyone is clear, call 911 if anyone is injured, then contact the utility company directly. Most states also require the excavator to report the damage to 811 within a short window after the strike. Keep everyone away from the area until the utility confirms the line is de-energized. Document what happened: photos of the strike location, the markings on the ground, the equipment in use, and any Certificates of Insurance you have on file. Those records are what determine, later, who actually pays.