An example of a metes and bounds property description reads like written walking directions around the edge of a parcel: it starts at a fixed marker on the ground, then names a compass bearing, a distance, and the next marker, repeating that pattern for each side of the property until the last leg closes back on the starting point. Here is a simplified but mathematically complete one:
Beginning at an iron pin set at the intersection of Old Mill Road and County Road 4, said pin being the Point of Beginning; thence N 30° E a distance of 200 feet to a stone wall; thence S 60° E a distance of 150 feet to a marked oak post; thence S 30° W a distance of 200 feet to an iron pin on the north side of County Road 4; thence N 60° W a distance of 150 feet along said road to the Point of Beginning.
Reading the Sample Leg by Leg
The description above traces a four-sided parcel. Each “thence” starts a new boundary segment, and each segment names a direction, a distance, and the object you should find at the end of it.
- Point of Beginning. An iron pin at the intersection of Old Mill Road and County Road 4. The pin is a placed marker; the road intersection tells anyone reading the deed roughly where in the world to look for it.
- First leg — N 30° E, 200 feet, to a stone wall. Stand at the pin, face north, rotate 30 degrees toward the east, walk 200 feet. You should reach a stone wall.
- Second leg — S 60° E, 150 feet, to a marked oak post. From the wall, face south, rotate 60 degrees toward the east, and walk 150 feet to an oak post that was marked as a boundary corner.
- Third leg — S 30° W, 200 feet, to an iron pin on the north side of County Road 4. Face south, rotate 30 degrees toward the west, and walk 200 feet to another iron pin sitting along the road.
- Fourth leg — N 60° W, 150 feet, along said road, to the Point of Beginning. Follow the road 150 feet and you are back where you started.
That final return is not a stylistic flourish. A valid description has to come back to its point of beginning on paper as well as on the ground. If you add the north-south components of every leg and the east-west components of every leg, both sums should be zero. Any discrepancy is called a closure gap, and it means there is an error somewhere in the bearings or distances.
The Four Building Blocks
Every metes and bounds description, no matter how long, is built from four elements. Once you can identify them individually, any deed becomes readable.
Point of Beginning
The point of beginning is the fixed, identifiable spot where the description starts and ends. It anchors the entire parcel to the physical world. A surveyor might use a driven iron pin, a concrete monument, or a natural feature like the intersection of two stone walls. Whatever it is, it has to be specific enough to be “capable of definite identification and susceptible to only one interpretation.”1Bureau of Land Management. BLM Module 3 Metes-and-Bounds Study Guide If the point of beginning can’t be found on the ground, the description is effectively useless.
Bearings
Bearings tell you which direction to travel. They are written as an angle measured from either north or south toward east or west. “N 30° E” means face north and rotate 30 degrees toward the east. “S 60° E” means face south and rotate 60 degrees toward the east. The first letter tells you which pole to face, the number tells you how far to turn, and the last letter tells you which way to turn. The angle always sits between 0 and 90 degrees, so “N 0° E” is due north and “S 90° W” is due west.
Distances
Each bearing is paired with a distance, the length you travel along that bearing before reaching the next corner. Modern descriptions use feet. Older deeds may use chains: one chain equals 66 feet and contains 100 links, a unit originally designed to make acreage calculations easier.2U.S. Geological Survey. Order of the Surveyors Chain So “10 chains” in an old deed is 660 feet.
Distances are the element most likely to cause trouble over time. Landscape changes, differences in measuring tools between eras, and simple human error can all produce mismatches between what the deed says and what a surveyor finds today. When that happens, the priority of calls decides which element controls.
Monuments
Monuments are the physical objects the description points to at each corner. They come in two flavors. Natural monuments exist without human intervention: rivers, ridges, rock outcroppings, large trees. Artificial monuments are placed by people: iron pins, concrete posts, stone walls, fences, roads, railroad tracks.
The distinction carries real legal weight. The U.S. Supreme Court held in Brown v. Huger (1858) that “wherever natural or permanent objects are embraced in the calls of a patent or survey, these have absolute control, and both course and distance must yield to their influence.”3Library of Congress. U.S. Reports – Brown et al. v. Huger, 62 U.S. (21 How.) 305 (1858) If a deed says “north 200 feet to the creek” and the creek is actually 210 feet away, the creek wins.
Artificial markers are more precise than natural features but less permanent. Pins get pulled, fences get moved, buildings get demolished. When an artificial monument disappears, surveyors reconstruct its original location using field notes, bearing trees, testimony from neighboring landowners, and proportionate measurements from known corners that still exist.4Department of the Interior, General Land Office. Restoration of Lost or Obliterated Corners and Subdivision of Sections
When the Elements Disagree: Priority of Calls
Real deeds frequently contradict themselves. The bearing might point one way, but the named monument sits slightly off that line. The distance might say 200 feet when the landmark is at 215 feet. Courts and surveyors resolve these conflicts using a long-established ranking:5Bureau of Land Management. The Basics of Boundary Law Study Guide
- Natural monuments (rivers, ridges, rock ledges) rank highest.
- Artificial monuments (iron pins, survey markers, stone walls) rank second.
- Distances (measured lengths) rank third.
- Bearings or courses (compass directions) rank fourth.
- Acreage (stated area) ranks last.
The logic behind the ranking is that higher-ranked elements are harder to fake and easier for anyone to verify on the ground. Stated acreage is just arithmetic derived from the boundary lines. If the lines are wrong, the acreage figure is meaningless.
The practical rule for reading a description: when the bearings don’t quite point to the named landmark, the landmark controls. When the distance says 300 feet but the stone wall is at 310 feet, the stone wall wins. The higher-ranked element reflects the original surveyor’s intent more reliably than the lower-ranked one.
Where This System Applies
Metes and bounds is the primary land description system in roughly 20 states, mostly those settled before Congress adopted the Public Land Survey System in 1785. These include the New England states, the mid-Atlantic states, and several southern states like Virginia, the Carolinas, Georgia, Tennessee, Kentucky, and Texas. If your property is in one of these states, your deed almost certainly uses metes and bounds.
Most of the country west of the original colonies uses the Public Land Survey System instead, a rectangular grid that divides land into townships, ranges, and sections. A PLSS description reads nothing like the sample above. It looks more like “the NW 1/4 of Section 12, Township 3 North, Range 5 East,” referencing a grid established from a principal meridian and base line. Even in PLSS states, parcels that don’t fit the grid, like those along rivers or with irregular shapes, are often described using metes and bounds for the edges that depart from the rectangular system.6Bureau of Land Management. Specifications for Descriptions of Land
Gaps, Overlaps, and Lost Markers
Errors in metes and bounds descriptions create two recurring problems. A gap occurs when neighboring parcels don’t quite meet, leaving a sliver of unowned land between them. An overlap occurs when two descriptions claim the same strip of ground. Both generate disputes, and they happen more often than you would expect, especially when a property has been subdivided and described from different directions over the years.
Gaps are especially awkward because neither neighbor holds title to the surplus. The original grantor technically still owns it, even if that grantor sold the property decades ago. Overlaps are resolved more predictably: the deed recorded first, the “senior” deed, generally takes priority.
Lost monuments compound the problem. Surveyors distinguish between an obliterated monument, where the marker is gone but its original location can be reconstructed from other evidence, and a truly lost monument, where the position cannot be determined beyond reasonable doubt. For obliterated corners, a surveyor works from the original field notes, bearing trees, neighbor testimony, and measurements to nearby surviving corners. For truly lost corners, the standard fallback is proportionate measurement, which distributes the discrepancy evenly between the nearest surviving corners on either side.4Department of the Interior, General Land Office. Restoration of Lost or Obliterated Corners and Subdivision of Sections Both processes are why the wording of the description, and the durability of the monuments it names, matter so much decades after the deed is signed.