If a Subcontractor Does a Bad Job, What Are Your Options?

If a subcontractor does a bad job on your project, your legal claim almost always runs through the general contractor who hired them, not the subcontractor directly. The GC signed your contract and is responsible for delivering the finished project to spec, no matter who swung the hammer. That one fact shapes every move you make from here: how you document the problem, who you put on notice, and who you ultimately sue if it comes to that.

Who You Actually Have a Claim Against

A legal concept called privity of contract controls who owes what to whom. Only the parties who signed an agreement can enforce it against each other.1Legal Information Institute. Privity Your contract is with the general contractor, so the general contractor is on the hook for the entire project, including every subcontractor’s work. If the tile installer botched the bathroom or the electrician ran wiring that doesn’t meet code, your complaint goes to the GC.

The GC has a separate contract with each sub and can pursue them for the cost of fixing their mistakes. That is the GC’s problem, not yours. You don’t need to track down the individual sub, negotiate with them, or even know the terms of their deal with the GC. One point of contact, one party to hold accountable. The GC is also expected to manage quality as the project moves along, so when defective work slips through, it’s a breach of the GC’s obligation to you.

If You Hired the Subcontractor Yourself

Not every project uses a general contractor. If you acted as your own GC and hired tradespeople individually, you have privity of contract with each one, and your claim is directly against the person who did the bad work. The steps below still apply. Just replace “general contractor” with the name of whoever you contracted with. The documentation, notice, and legal remedies work the same way.

Document the Defects Before You Say Anything

Nothing moves forward without proof. Before you call the contractor, send an email, or talk to a lawyer, build a record that would hold up under scrutiny.

  • Photographs and video of every problem area, from multiple angles, with a tape measure or ruler for scale. Turn on your camera’s timestamp so the date is embedded in the file metadata.
  • A written defect log listing each deficiency, where it is, when you found it, and how it departs from what was specified. Be precise enough that someone who has never seen the project could understand the problem.
  • Project paperwork: your signed contract, change orders, plans or drawings, scope of work, and every email, text, and letter exchanged with the contractor.

Pay for an Independent Inspection

For anything beyond cosmetic complaints, hire a licensed home inspector or structural engineer to evaluate the work. A professional inspection report does two things your own photos cannot: it identifies defects you may have missed, and it carries expert credibility if the dispute escalates. Ask the inspector to document the defects, explain their cause, and estimate the cost to repair. That estimate becomes the baseline for what you’re owed.

This is where homeowners cut corners and pay for it later. A $500 inspection that finds $30,000 in hidden water damage behind a badly installed shower pays for itself many times over. Without it, you’re guessing at the scope of the problem and the contractor knows it.

Put It in Writing

Verbal complaints don’t create a legal record. Once your documentation is together, send the general contractor a formal written notice identifying each defect. Reference specific contract provisions, plan details, or building codes the work violates. Attach copies of your photos and the inspection report.

Send the notice by certified mail with a return receipt requested. The green card you get back proves the contractor received your complaint and when. From that point forward, keep all communication with the contractor in writing, even if you also talk on the phone. After every call, send a short email summarizing what was discussed.

Read Your Contract Before You Do Anything Else

Before you hire a different contractor, withhold payment, or file suit, read your contract cover to cover. Two kinds of clauses can derail your plans if you miss them.

Right-to-Cure Provisions

Many construction contracts require you to give the contractor a set window, often 10 to 30 days, to fix problems before you can take further action. Skip this step and jump straight to hiring someone else or filing a lawsuit, and the contractor can argue you breached the contract first by denying them the chance to make it right.

A majority of states have also enacted “right to repair” or “notice and opportunity to cure” statutes that apply to construction defect claims. These laws require homeowners to send formal pre-litigation notice and wait a specified period before filing suit. Non-compliance can get your case dismissed, so check whether your state has one of these laws before taking legal action.

Arbitration or Mediation Clauses

Many residential construction contracts require disputes to go through arbitration or mediation instead of court. If your contract has an arbitration clause, filing a lawsuit may not be an option. A court can force you into arbitration if the contractor invokes the clause, costing you time and legal fees before you end up in the process you should have started with.2American Arbitration Association. Home Construction Arbitration Rules and Mediation Procedures

Mediation is different. A neutral mediator helps both sides negotiate, but nobody is forced to accept a deal. Some contracts require mediation first, then arbitration if mediation fails. Read the dispute resolution section carefully and follow the required sequence.

Withholding Payment, and the Mechanic’s Lien Risk

If you still owe the contractor money, holding back payment feels like the obvious move. Sometimes it’s justified. Done wrong, it flips the situation against you.

Many contracts include a “retainage” provision that holds back a percentage of the contract price, often around 10%, until all work is finished and the punch list is resolved. If your contract has this language, you’re already entitled to withhold that portion. The risk comes from going beyond what the contract allows. Stop payments entirely without following the contract’s procedures, and the contractor can argue you breached first.

Their most powerful tool when they believe they’re owed money is a mechanic’s lien, a legal claim recorded against your property for unpaid work or materials. A lien clouds your title, which means you can’t sell or refinance until it’s resolved. Even if the underlying work was defective, a lien creates real problems that take time and money to clear. If a lien is filed, you can challenge its validity on procedural grounds, bond it off to free your title during the dispute, file a notice of contest to shorten the lienholder’s window to sue, or negotiate a reduced settlement. Lien laws and deadlines vary significantly by state, so talk to a local attorney before choosing an approach.

If you plan to withhold payment, document in writing exactly why, tying each withheld dollar to a specific defect and the contract provision it violates. Don’t withhold more than the estimated cost to fix the defective work. Being precise and proportional is what separates a justified withholding from a breach.

Pressure Routes Outside Court

File a Complaint With the State Licensing Board

Most states require contractors to hold a license, and the agency that issues the license also investigates complaints. Filing is free in most states and can result in disciplinary action, fines, or license revocation.

A licensing board investigation doesn’t directly get you money. Its purpose is regulatory enforcement, not financial restitution. That said, a substantiated complaint creates an official record of the contractor’s bad work, which strengthens any separate legal or insurance claim. Some contractors become far more willing to negotiate once their license is at risk. A handful of states also maintain contractor recovery funds that can compensate homeowners for defective work by a licensed contractor, usually only after you have exhausted other remedies and obtained an unpaid judgment.

File a Claim Against the Contractor’s Surety Bond

Licensed contractors in many states must carry a surety bond as a condition of their license. The bond acts as a financial guarantee for consumers harmed by the contractor’s failure to meet their obligations. You submit a claim to the surety company along with documentation of the defective work and your losses. The surety investigates, and if it validates the claim, it may pay you up to the bond’s limit, arrange for a completion contractor, or negotiate a settlement.

Bond amounts are set by state law and vary widely. In many states the required bond is modest, sometimes only $10,000 to $25,000, which may not cover the full cost of repairing major defects. It’s still worth pursuing as one piece of your overall recovery, especially when the contractor is unresponsive or financially unstable.

Taking the Contractor to Court

When the contractor won’t fix the work, won’t negotiate, and informal remedies have failed, a lawsuit may be the remaining path. The most common claim is breach of contract: the contractor agreed to deliver work meeting certain standards and didn’t.

What You Can Recover

The primary measure of damages is the cost to repair the defective work. Recoverable losses often go beyond that. If non-defective parts of the structure must be torn out to access and fix the problem, those “rip and tear” costs are compensable. Damage the defective work caused to other parts of the building counts too. Loss of use during repairs, temporary housing costs, and diminished property value are all categories courts have recognized as consequential damages in construction defect cases.

Whether you can recover attorney fees depends on your contract and your state’s laws. Some contracts include a fee-shifting provision, and some states allow fee recovery in construction defect actions by statute.

Small Claims Court

If the cost to fix the defective work falls within your state’s small claims limit, this is often the fastest and cheapest route. Small claims courts are built for people without lawyers. Dollar limits typically run from $5,000 to $25,000, with a few states allowing claims up to $30,000 or more. Filing fees are low, the process is informal, and hearings usually happen within a few weeks to a couple of months. Small claims works best for contained problems like a bad paint job, improperly installed fixtures, or a specific scope that clearly doesn’t match the contract. For large-scale structural defects or complex multi-trade disputes, you’ll likely need full civil court and an attorney.

The GC’s Side Fight With the Subcontractor

When you sue the general contractor, the GC will often file a separate claim against the sub who did the defective work. That’s called a third-party complaint, and it’s how the GC tries to pass liability down to the party at fault. The side dispute doesn’t directly involve you. Your case against the GC proceeds on its own, and the GC’s fight with the sub is theirs to manage.

Implied Warranty of Workmanship

Even if your contract is thin on quality standards, most states recognize an implied warranty that construction work will be performed in a reasonably competent manner and be free of major defects. This warranty exists by operation of law, meaning it applies even when the contract doesn’t mention it. If the work is so poor that no reasonable contractor would consider it acceptable, an implied warranty claim can supplement or replace a contract-based claim.

Deadlines That Can Kill Your Claim

Every state puts time limits on construction defect lawsuits, and two kinds of deadlines are in play. A statute of limitations sets how long you have to file after you discover the defect, or after it should reasonably have been discovered. These periods typically range from about one to six years depending on the state and the type of claim.

A statute of repose is a harder cutoff. It runs from the date construction was substantially completed, regardless of when you actually noticed the problem. If a hidden plumbing defect doesn’t cause visible damage until year nine and your state has a ten-year statute of repose, you still have time. If it surfaces in year eleven, you may be out of luck even though you just found it. Statutes of repose across the country run from as short as four years to as long as twenty, with most falling between six and ten.

These deadlines are unforgiving. A valid claim with perfect documentation and clear liability is worth nothing if you file one day too late. If you suspect defective work, check your state’s deadlines early and don’t sit on the problem.